Wind Potential & State Govt. Approval

Wind power installations world-wide have crossed 86.3 GW, producing over 52 TWH of energy annually. The World Energy Council has estimated that, by 2010 A.D., the world wind power capacity can increase to 70 GW under the current policy scenario, and even 100 GW under a ecologically driven scenario.

Sl. No. State Gross Potential
(MW)

(a)
Technical Potential
(MW)

(b)
Installed Capacity
(MW)

(c)
1. Andhra Pradesh 8275 1920 121.1
2. Gujarat 9675 1780 667
3. Karnataka 6620 1180 847
4. Kerala 875 605 2.0
5. Madhya Pradesh 5500 845 58
6. Maharashtra 3650 3040 1485
7. Orissa 1700 780 2
8. Rajasthan 5400 910 470
9. Tamilnadu 3050 1880 3460
10. West Bengal 450 450 1.6
11. Other States - - 0.5
  Total 45195 MW 13390 7114 MW

Source : M N E S

  1. Assuming 0.5% of land availability for Wind Power generation in potential areas.
  2. As on 31.03.98, assuming 20% grid penetration
  3. as on 31.03.2007



POSSIBLE GENERATION
PER MW
( in lacs units )
Tamil Nadu 16 - 20
Maharashtra 14 - 16
Karnataka 14 - 20
Gujarat 12 - 14
Andhra Pradesh 12 - 16
Madhya Pradesh 12 - 14



Items Wheeling Banking Buy-back Third party-sales Other Incentives Penality on kVARh consumption
Andhra Pradesh 2% of energy - Presently Rs.3.37
w.e.f 01.04.2004
(frozen for 5 years)
Allowed
as per E.Act 2003
subject to
APERC Regulations
NOT Available
NEDCAP
Van Drawal
0.10p/unit.

To Give 10 Lakhs / MW to APTransco

1 lakh /to NEDCAP
Tamilnadu 5% of energy 5% for
12 months
Rs. 2.90/kwh
(No Escalation)
Not Allowed
NIL
No generation tax.
Karnataka 5% of energy
+1.15Kwh as
cross subsidy
for 3rd party sale
2% every month for
12 months
Rs. 3.40 / kwh
no ecalation
for 10 years
Allowed to HT consumers same as for other industries No generatin tax for 5 years
Van drawal
0.40p/unit
Kerala To be decided
by SERC
- 3.14 for
20 years
- 15% (max Rs. 5 lakhs) -
Uttar Pradesh 2% of energy 12 months Rs. 2.25/kwh
( 5% Esc.
95-96 )
Allowed same as for other industries -
West Bengal 2% of energy 6 months to be decided on case to case basis Not Allowed - -
Gujarat 4% of energy 6 months Rs. 3.37/kwh Not Allowed - R.P.<10% energy
0.10 P.>10% 0.25p
Madhya Pradesh 2% of energy
+Transmission charges by SERC
Not Allowed

Present Rs.3.97p/kwh coming down to Rs 3.30 from the 5th year to 20th year

Allowed same as for other industries 27 paise per kVARh
Maharashtra 2% of energy
+5% T&D loss
2% for
12 months
Rs. 3.50/kwh with escalation of 15 p per unit/year for 13 years Allowed 30% (max Rs. 20 lakhs per project ) Sales tax (Exemption for 6 years subject to a minimum PLF of 20%)
Rajashthan  2% of Energy  2% for
12 months
present
Rs. 3.32/kwh
 Allowed  - Details Contact IWTMA